|
- Relocation of a several-mile continuous section of gas main, in a dual trench
- Relocated overhead electrical and fiber optic facilities, provided backfeed for construction, researched and located all services to users along the routes
- Provided layout, design, construction quantity/cost calculations, and engineering design details in accordance with NJDOT standards
|
|
|
|
|
|